Vivo Energy Uganda
Project: Construction of a fire fighting system at Busia Depot
Scope of Work: Contruction of a 150m3 fire water tank in Busia
Year of Execution: 2023
Status: Ongoing


Entebbe International Airport
Project: 250m3/h pumping unit for Jet-A1 hydrant line at Entebbe international airport
Scope of Work: Contruction of a 6.5km underground, 10 inch Jet-A1 hydrant line at the entebbe international airport
Year of Execution: 2018
Status: Completed
Luqman Petroleum
Project: Contruction of a 5 million litre Jet-A1 tanks at Wau Airport, South Sudan
Scope of Work: Turnkey project: Construction of the tank farm and general pipe line.
Status: Completed


Tristar (C/o: UNIMISS)
Project: Construction of the Jet-A1 tanks
Scope of Work: Different sizes of tanks ranging from 500m3 to 2,000,000m3
Status: Completed
Entebbe International Airport
Project: Construction of a 12m litre Jet-A1 tanks
Scope of Work: Office block, tanks, unloading/ loading gantry, forecourt, dike wall, perimeter wall, drive ways, electrical / scada system
Year of Execution: 2018
Status: Completed


Total Energies
Project: Building of pipeline rack and loading gantry
Scope of Work: Pipeline rack, gantry at 8th street industrial area
Sub Contracted by: Civtec Africa Ltd
Year of Execution: 2019
Status: Completed